MDMI (Thailand) Ltd.

EA Battery Factory

Client: Energy Solution Management Co., Ltd.
Completion Year: 2021
Location: Eastern Economic Corridor, Chachoengsao, Thailand

Project Details

About the Project

This project is located on EEC (Eastern Economic Corridor) Chachoengsao nearby in-bound Services Area of the Motor Way No. 7. The client plans to build a two-stories building with observation mezzanine for 1 GWH battery production, and utilities platform at floor between 1st and 2nd floor, and 2nd floor to roof. There are a full automation of both process and warehousing. Main factory surrounded by ancillary building and main power supply utilities.

Clean Room Class ISO8 (FED-290E Class 100,000)

Scope of Services:

Concept Design Stage / Detailed Design Stage / Regulatory Authority Submission Stage / Tender & Construction Drawings Stage